TEXAS ENTITLEMENTAustin Development Watch ›
Firm profile

Advanced Consulting Engineers

Land-use entitlement firm · 6 unique cases
8
Hearings
6
Cases
4
Concluded
50.0%
Approved of concluded
2017–2019
Active
0
Since 2024

The record, at case level

Of Advanced Consulting Engineers’s 6 unique cases, 4 have concluded — reached a Planning Commission or ZAP decision — and 2 of those ended in approval at their final hearing: 50.0%.

Unique-case counts here are distinct case numbers. 1 of this record’s hearings also carry a case name but no number — but ~0% of those are the same matter as a numbered case already counted above, so the true unique-case count is a narrow range: 6 numbered, up to ~7 including the genuinely un-numbered matters. The case-level approval rate is computed on concluded numbered cases and is unaffected.

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

Advanced Consulting Engineers: hearings by year2017: 3, 2018: 4, 2019: 1243’174’181’19

Outcome distribution

Advanced Consulting Engineers: outcomesApproved: 2 (25%), Denied: 3 (38%), No decision: 3 (38%)25%38%38%Approved 2Denied 3No decision 3

Hearing timeline

Hearing dateOutcomeDistrictAgent
2019-05-14DeniedD4Ashraf Ahsanullah
2018-05-08DeniedD4Ashraf Ahsanullah
2018-05-08No decisionD4Ashraf Ahsanullah
Pro · Full record
The complete 8-hearings record is a Pro feature. See what Pro unlocks →

Where they practice

D7 3D4 3

Hearing-level rates, for comparison

Postponement rate vs the fieldAdvanced Consult: 0%, Field median: 42%Advanced Consult0%Field median42%
Approval rate 40.0% — below the field (48.7%) by 8.7 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 40.0% (vs the field’s 48.7%) and postponement is 0.0% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

C8-2019-0069.0AC8-2018-0063.0AC8-84-150-4(85)VACC8-84-150C8-2017-0259.0AC8J-2017-0036.0A
Coverage note. Hearing counts on this page are FLOORS, and percentages are ESTIMATES computed over the hearings we hold. Measured against the City's own meeting record, the certified store carries 6,712 of the 6,728 hearing items its source documents describe since 2016 — 99.8% — with coverage weakest in 2020 (98.7%). A firm's true hearing count is therefore at least the number shown, and a rate is the rate within the held sample rather than the full population. Coverage is measured, not assumed, and this note is derived from that measurement on every rebuild. A second step sits between these rates and the population: of the 6,667 hearing items read from the minutes, 5,513 (82.7%) state a disposition this record can classify and 1,154 do not. Unclassified items carry no outcome and are absent from every rate above, so a rate is computed over the classified part of a sample, not over the sample and not over the population. THIS LIMITS COMPARABILITY BETWEEN FIRMS. The unclassified items are not spread evenly: engineering and surveying practices carry about 75% of the named ones (Southwest Engineers, LJA Engineering, Perales Engineering, Stantec Consulting Services among them), because subdivision dispositions are recorded in grouped consent motions rather than per item. Those firms' rates therefore rest on a smaller classified subset than a zoning practice's, and a high approval share at the top of the table may reflect which of a firm's matters could be classified rather than how its matters went. WE MEASURE OUR OWN ERROR AND IT IS NOT UNIFORM. Re-reading every minutes block against the stored disposition found 8.2% disagreement across 3,073 independently-written rows before correction — 6.03% in 2017-2019, 11.73% across the remote-meeting years 2020-2022, 6.12% in 2024-2025 — and about 1.56x as high on Zoning and Platting as on Planning Commission. All of it has been corrected against the minutes and logged; the shape is published because where a record is weakest is a fact about the record.
Austin Development Watch · every figure traces to a certified record · hearing data through 2026-08-25 · Council outcomes through 2026-05-28 · gate-certified · generated 2026-08-31