TEXAS ENTITLEMENTAustin Development Watch ›
Attorney profile

Sergio Lozano-Sanchez, P.E.

Land-use attorney of record · 3 unique cases
18
Hearings
3
Cases
3
Concluded
100.0%
Approved of concluded
2018–2026
Active
17
Since 2024

The record, at case level

Of Sergio Lozano-Sanchez, P.E.’s 3 unique cases, 3 have concluded — reached a Planning Commission or ZAP decision — and 3 of those ended in approval at their final hearing: 100.0%.

Postponement is a clock, not a verdict: of the 2 concluded cases postponed at least once, 2 still ended in approval (100.0%).

Counted once per case, not once per hearing: a case postponed several times before approval would otherwise read as several losses and one win.

Hearings by year

Sergio Lozano-Sanchez, P.E.: hearings by year2018: 1, 2019: 0, 2020: 0, 2021: 0, 2022: 0, 2023: 0, 2024: 0, 2025: 7, 2026: 105101’18’19’20’21’22’23’247’2510’26

Outcome distribution

Sergio Lozano-Sanchez, P.E.: outcomesApproved: 3 (17%), Postponed: 15 (83%)17%83%Approved 3Postponed 15

Hearing timeline

Hearing dateOutcomeDistrictFirm
2026-06-23ApprovedD2LOC Consultants Civil Division
2026-06-23ApprovedD2LOC Consultants Civil Division
2026-06-09PostponedD2LOC Consultants Civil Division
Pro · Full record
The complete 18-hearings record is a Pro feature. See what Pro unlocks →

Firm

LOC Consultants Civil Division

Where they practice

D2 18

Hearing-level rates, for comparison

Postponement rate vs the fieldSergio Lozano-Sa: 83%, Field median: 42%Sergio Lozano-Sa83%Field median42%
Approval rate 16.7% — below the field (48.7%) by 32.0 pts.

At the hearing level every appearance counts, so a case postponed N times adds N postponements and one decision. Hearing-level approval-of-decided is 16.7% (vs the field’s 48.7%) and postponement is 83.3% — both far from the case-level figure above, for exactly that reason. Two stages, two denominators: these are commission-stage outcomes (approve vs. postpone/deny at the Planning Commission or ZAP hearing), not the City Council vote. Once a Commission-recommended case reaches Council it is approved in the high-90s%, so a low commission-stage approval rate reflects strategic postponement, not defeat.

Recent cases

NPA-2023-0014.04C14-2025-0065C14-2017-0130
Coverage note. Hearing counts on this page are FLOORS, and percentages are ESTIMATES computed over the hearings we hold. Measured against the City's own meeting record, the certified store carries 6,712 of the 6,728 hearing items its source documents describe since 2016 — 99.8% — with coverage weakest in 2020 (98.7%). A firm's true hearing count is therefore at least the number shown, and a rate is the rate within the held sample rather than the full population. Coverage is measured, not assumed, and this note is derived from that measurement on every rebuild. A second step sits between these rates and the population: of the 6,667 hearing items read from the minutes, 5,513 (82.7%) state a disposition this record can classify and 1,154 do not. Unclassified items carry no outcome and are absent from every rate above, so a rate is computed over the classified part of a sample, not over the sample and not over the population. THIS LIMITS COMPARABILITY BETWEEN FIRMS. The unclassified items are not spread evenly: engineering and surveying practices carry about 75% of the named ones (Southwest Engineers, LJA Engineering, Perales Engineering, Stantec Consulting Services among them), because subdivision dispositions are recorded in grouped consent motions rather than per item. Those firms' rates therefore rest on a smaller classified subset than a zoning practice's, and a high approval share at the top of the table may reflect which of a firm's matters could be classified rather than how its matters went. WE MEASURE OUR OWN ERROR AND IT IS NOT UNIFORM. Re-reading every minutes block against the stored disposition found 8.2% disagreement across 3,073 independently-written rows before correction — 6.03% in 2017-2019, 11.73% across the remote-meeting years 2020-2022, 6.12% in 2024-2025 — and about 1.56x as high on Zoning and Platting as on Planning Commission. All of it has been corrected against the minutes and logged; the shape is published because where a record is weakest is a fact about the record.
Austin Development Watch · every figure traces to a certified record · hearing data through 2026-08-25 · Council outcomes through 2026-05-28 · gate-certified · generated 2026-08-31